Collective Housing Constanța
project type: design development, planning and develpment approval,spatial coordination, technical design, detailing
year: 2021-2023
place: Constanța
status: construction phase
team: DRS Architects
Through the morphological study, we focused on the response of the building to the two types of environments found in the context. This is where the general idea of the project to use different coverings emerged. On one hand, the building addresses the built environment to the west through a more solid façade, with a higher degree of opacity (on the 1st and 2nd floors). On the other hand, towards the east, the construction will have a more permeable appearance, aided by terraces arranged in horizontal steps. This is done precisely to create a closer connection with the external environment. Last but not least, the contribution of vegetation from the promenade is incorporated into the project through planters arranged on each floor.
project type: design development, planning and develpment approval,spatial coordination, technical design, detailing
year: 2021-2023
place: Constanța
status: construction phase
team: DRS Architects
Through the morphological study, we focused on the response of the building to the two types of environments found in the context. This is where the general idea of the project to use different coverings emerged. On one hand, the building addresses the built environment to the west through a more solid façade, with a higher degree of opacity (on the 1st and 2nd floors). On the other hand, towards the east, the construction will have a more permeable appearance, aided by terraces arranged in horizontal steps. This is done precisely to create a closer connection with the external environment. Last but not least, the contribution of vegetation from the promenade is incorporated into the project through planters arranged on each floor.